| Kazakhstan Project |
|
| |
3 weeks' work
20 people serving
|
|
Project that was undertaken : building cabinetry for a school
Valued Memories: |
| |
|
|
|
|
|
|
 |
|
| |
3 weeks' work
20 people serving
13 from Hong Kong
7 Overseas
|
|
Project that was undertaken : renovating an existing building so that it better suits the need of the children.
Valued Memories: |
| |
|
|
|
|
|
| |
| |
 |
|
| |
3 weeks' work
8 people joined
8 Chinese
5 MMM team members
|
|
Project that was undertaken : Painting of rooms for children
Valued Memories: |
| |
|
|
|
|
|
| |
| |
 |
|
| |
3 weeks' work
13 people joined
8 Chinese
5 MMM team members
|
|
Project that was undertaken : 1) Build a covered outdoor playground and walkway
2) Build rooms for safe discipline 3) Extend office cubical wall
4) Extend the concrete entrance path
5) Lay cobble stones
Valued Memories: |
| |
|
|
|
|
|
| |
| |
 |
| |
3 weeks' work
23 people joined
4 Australians
2 New Zealanders
10 Chinese
7 MMM team members
MMM team included
the Robinson
children
It was a special trip
for the Robinson
children to experience
interaction with
the Chinese local
children
|
|
Project that was undertaken : 1) Build dividing walls with doors and glass panels
2) Water and waste pipes for sink benches and hand basins
3) Shift some electrical switches 4) Paint the new dividing walls
5) Construct computer desks and bookshelves for library 6) Fit bedroom cupboard doors
Valued Memories: |
| |
|
| |
|
|
|
|
|
| |
| |
 |
|
| |
In 2008
3 weeks' work
16 people joined
11 Australians
3 Chinese
2 MMM team members
>>>Returning
In 2009
3 weeks ' work
24 people joined
13 Australians
1 Dutch
6 Chinese
7 MMM team members
|
|
Project that was undertaken in 2008 : 1) Bricking the outside of a house
2) Putting in insulation
3) Lining the inside walls and ceilings 4) Wiring 5) Plumbing
6) Building and installing a kitchen
7) tiling and painting
Valued Memories: |
| |
|
| |
|
|
|
|
|
|
| |
| |
 |
|
| |
3 weeks' work
5 people joined
3 Chinese
2 MMM team members
|
|
Project that was undertaken : 1) Replacing taps and showers
2) Bricklaying works and Plastering, 3) Replacing plastic doors with steel ones
4) Tiling shower floors and mixing concrete 5) Placing paths
Valued Memories: |
| |
|
| |
|
|
|
|
|
|
| |
| |
 |
|
| |
5 days' work
1 Australian
3 MMM team members
|
|
|
|
|
|
| |
| |
 |
|
| |
5 weeks' work
4 - 24 / 6 / 2006
(3 weeks)
36 people joined
8 New Zealanders
11 Australians
13 Chinese
4 MMM team members
...continued in Sept
10 - 23 / 9 / 2006
(2 weeks)
10 people joined
1 New Zealander
1 Australian
5 Chinese
3 MMM team members
|
|
|
|
|
|
| |
| |
 |
|
| |
3 weeks' work
17 people joined
1 New Zealander
1 Australian
10 Chinese
5 MMM team members
|
|
Project that was undertaken : 1) Electrical upgrade 2) Some doors repaired
3) Ceiling replaced 4) Plumbing 5) A folding door constructed 6) Windows and wall painted
7) Office cubical built
Valued Memories: |
| |
  >>> more photos |
|
Sanming newspaper article - an interview done by local reporter |
|
|
|
|
|
| |
| |
 |
|
| |
3 weeks' work
36 people joined
4 Dutch
2 New Zealanders
13 Australians
11 Chinese
6 MMM team members
|
 |
|
|
|